9/26/08


DIAL Daily Activity Log Telescope
Type: Ch5 Ch2 Ch1
Date: 9/26/2008   Time Zone: GMT-5 Primary Diameter 16'' 4'' 4''
Operator: Kuang   F/# 4.5 1 1
Sky Condition Sky condition clear       Field Stop 1.5 mrads 4.3mrads 4.3mrads
           
Electronics
Laser power     before data acquisition    
  HV (kV) Green(W) UV(mW) BBO Crystal   PMT EMI8931QA R7400U-03 R7400U-03
285 Laser:  1.5 70 289.102   Voltage 1850V 800V 800V
291 Laser 1.5   61 297.088   Serial # 49
Ch5 Ch1 LICEL
Alignment Yes Yes
Disc Level 8 8 8
ADC Range (mV) 500 100 500
Comments Channel 1 can use 100 ADC range in future.
Channel 2should use 500 ADC range.
Data Description                    
  Filter Delay (us) ADC range
Start time End time △t(min) Ch1 Ch2 Ch5 Ch1 Ch2 Ch5 Ch1 Ch2 Ch5
The actual delay is 0.5us. actual delay is 13us 500
13:20 15:58 2 N/A N/A N/A 0 202 for 285, 192 for 291  5 500 100
Set the appropriate ADC range of ch1 and ch2. Ch2 was not used before. Its ADC range was 100mV, not enough. Change ch2 actual gate delay is 0. check the saturation effects.
16:09 16:32 2 0 190 (actual delay is 0) 2 100 500 500
change ch2 actual gate delay back to ~0.5us. Change ch5 gate delay back to 5us.
16:36 17:01
 
Purpose linearity test, data taking
Comments Channel 1 is the bottom channel (10%) of the mini-receiver. Channel 2 is 90% channel of the mini receiver. Channel 5 is big telescope channel. 

 


Range-corrected signal

 


 

Ozone retrieval (10-min resolution)