Alabama Climate Station Upgrade Site Survey Checklist
010390-01 ATHENS
(<--back)
SITE SURVEY CHECKLIST
(adapted from New England & Louisiana Checklists)

Date of Survey: March 15, 2005
Surveyed by: LB/BCC/JE
If existing site, provide COOP name/ID: ATHA1 - 010390-01 - Athens Water Plant
If moved site, provide old COOP name/ID:
If new site, provide new NERON name:
NWS WFO: HUN

CONTACT INFORMATION
Contact Name: Athens Wastewater Treatment Plant
Site Type (company / family / organization): Organization

Address: Observer: Robert J. Shar, Plant Superintendent
               PO Box 1089
               Athens AL 35611
Phone:    256-233-8774
Fax:        256-233-8732
Email:
Driving Directions: From Jct US Hwy 72 and US Hwy 31 in Athens, go South on US 31 3/4 mile, then turn left on Sanderfer Rd. Go 0.3 mi to plant.


SITE INFORMATION
Latitude (to 5 decimal places): 34.77438
Longitude (to 5 decimal places): 86.95873
Elevation (ft MSL): 680

PHOTOGRAPHY
Check when complete:

X N
X W
X NE
X NW
X E
X dist N
X SE
X dist E
X S
X dist S
X SW X dist W


SITE DESCRIPTION
Describe the property and surrounding area (urban/pasture/growing/fields/etc.):
Flat river bottom with woods to the north.


Describe the plot area (360 degrees, distance 300-600 meters)
(forest/hills/town/flat/steep/roads/structures)
Plot area has a gentle slope.

Obstructions:
Building 075-120/60-60/10-10
                      Trees 330-060/100-85/36-42
                      Transformer Box 190/30/08

Temperature White Green Blue Yellow Red
Precipitation White Green Blue Yellow Red
Wind White Green Blue Yellow Red
Soil Moisture White Green Blue Yellow Red
Overall White Green Blue Yellow Red

Provide rationale for the classification choices on the previous page.
Plot size is not large enough to support soil moisture readings and information would not be representative of surrounding area anyway. Plot, even with gentle slope, will support temp and precip readings.

MISCELLANEOUS SITING
What plot size is available? small
Is AC power available / Can it be shared? no
Is there internet connectivity / computer? yes - inside plant building
Can the site plot be staked for easy finding? - not necessary, existing equipment
Would the host allow a concrete foundation or guide wires for a 10m wind tower? N/A
Is a fence around the sensors necessary? - possibly
Would badges/passes be needed for access? - no
How close can trucks/vehicles get to site for delivery of equipment/materials? direct access
Is 24/7/365 access available? - yes
What is the depth of the frost zone?
What is the depth of the water table?

Are there underground wires/cables? - no, once MMTS is removed
Miscellaneous notes: