Alabama Climate Station Upgrade Site Survey Checklist
018469-02 VALLEY HEAD Water Plant
[104-35]

(<--back)
SITE SURVEY CHECKLIST
(adapted from New England & Louisiana Checklists)

Date of Survey: March 17, 2005
Surveyed by: JE/MEC/LB
If existing site, provide COOP name/ID:

If moved site, provide old COOP name/ID:
VYHA1 - 018469-02 - Valley Head
If new site, provide new NERON name: (Valley Head Water Plant)
NWS WFO: HUN

CONTACT INFORMATION
Contact Name: Valley Head Water Board
Site Type: (company / family / organization) Organization

Address: Observers: Lisa Smith & Dennis Lewis
               101 School Street
               P.O. Box 195
               Valley Head, AL 35989

Phone:    256-635-6527
Fax:        256-635-6558
Email:
Driving Directions: From intersection of I-59 and AL 117, go South on AL 117 for 2.7 miles. Turn left on School Street in Valley Head. Water works board is immediately on the left.


SITE INFORMATION
Latitude (to 5 decimal places): 34.56533
Longitude (to 5 decimal places): 85.61707
Elevation (ft MSL): 984

PHOTOGRAPHY
Check when complete:

X N
X W
X NE
X NW
X E
X dist N
X SE
X dist E
X S
X dist S
X SW X dist W


SITE DESCRIPTION
Describe the property and surrounding area (urban/pasture/growing/fields/etc.):
large open field (72x72) surrounded by hills & mountains.


Describe the plot area (360 degrees, distance 300-600 meters)
(forest/hills/town/flat/steep/roads/structures)
flat plot

Obstructions:
obstructions: tree 150/36/44
                     
                       

Temperature White Green Blue Yellow Red
Precipitation White Green Blue Yellow Red
Wind White Green Blue Yellow Red
Soil Moisture White Green Blue Yellow Red
Overall White Green Blue Yellow Red

Provide rationale for the classification choices on the previous page.
see above.

MISCELLANEOUS SITING
What plot size is available? large
Is AC power available / Can it be shared? yes
Is there internet connectivity / computer? yes
Can the site plot be staked for easy finding? - yes
Would the host allow a concrete foundation or guide wires for a 10m wind tower? yes
Is a fence around the sensors necessary? - possible but not likely
Would badges/passes be needed for access? - no
How close can trucks/vehicles get to site for delivery of equipment/materials? within 100 ft

Is 24/7/365 access available? - yes
What is the depth of the frost zone?
What is the depth of the water table?

Are there underground wires/cables? - septic tank and fill lines close to bldg
Miscellaneous notes: please ask before drilling into ground where tank & lines are located.